This report is written for the design of a new production facility to product the Ginaf HD5380T mining truck. Several requirements were studied to reach an output of five trucks per week. The study relates to:
• Purchasing, which parts should be purchased centrally at Ginaf Veenendaal and which products should be purchased locally;
• Production, what does the design of the production process look like and what is the standard time to produce the truck;
• Lay-out, what is the proposed lay-out for a new production facility.